Day Kind Time Note
2026-10-05 coding 2h 30m Keep moving, and find JPR spends too long.
2026-10-04 coding 3h 30m Keep moving, routing and placement is so slow
2026-10-03 coding 4h Keep moving
2026-10-02 coding 3h 30m After finding slot, we seperate our system into 2 stage, 1 is global JPR, 2 is detailed JPR. Looks like some help.
2026-10-01 coding 2h Keep moving
2026-09-28 coding 1h 30m Continue optimizing
2026-09-22 coding 2h Keep finding path
2026-09-21 coding 1h Keep finding the way, finding in lut level JPR may better?
2026-09-16 coding 1h Try to reorganize
2026-09-08 coding 2h Continue Optimizing, and also prepare meeting with APRIL
2026-09-07 coding 4h Prepare for meeting tmr, and find a way for JPR
2026-09-06 coding 2h Optimizing
2026-09-01 coding 1h Finding possible cooperation
2026-08-25 coding 2h First time find FPGA repetition useful
2026-08-24 coding 1h 15m Start with new JPR6 version, with new method. Involving more ai and using repeat arch of FPGA this time
2026-08-23 coding 30m Checking if we need to change another path